Beaverton, OR

Panel Upgrades & Service

The panel decides what else this house can run. A new one means real capacity, modern breakers and a schedule the next electrician can read — pulled on a permit and signed off by an inspector.

Newly installed residential electrical panel with neat labelled breakers

Why the panel is the job other jobs wait on

Almost every modern addition lands on the panel — a charger, a heat pump, an induction range, a hot tub. If the service cannot deliver it, no amount of clever wiring downstream changes that. We run the load calculation first, so you find out before you have bought the appliance rather than after it is sitting in the garage.

What happens while we are there

The power comes off while we work, and the utility's part of it sets the timing rather than us. Old circuits get traced one at a time as they move across, which is the slow part of the day and the part that makes the new labels honest. We tell you what to plan for — fridges, freezers, and anyone working from home.

How to judge a panel quote

Ask three things: is the permit in the number, are grounding and bonding included, and will the circuits be traced or guessed. A quote that comes in oddly low has usually dropped one of those, and the missing one shows up later as a failed inspection or a panel nobody can read. Ours says the permit is in the price, and the schedule on the door is written from what we actually found.

Simple & clear

How A Job Runs

  1. 01

    We Look, And We Test

    Not just at the thing you called about — at the panel, the load and how the house is fed. Most electrical problems are somewhere other than where you noticed them.

  2. 02

    You Get A Fixed Price

    In writing, before we start, including the permit. If the honest answer is that it can wait, we will say so and you can call us in a year.

  3. 03

    Permit Pulled

    We file it, and the work is scheduled around the inspection rather than hoping nobody asks. This is the part that matters when you sell.

  4. 04

    Installed And Labelled

    Conductors dressed, breakers labelled properly, and a panel schedule the next electrician can read.

  5. 05

    Inspected And Signed Off

    We meet the inspector, and you get the paperwork. A job with no record is a job you have to explain later.

Questions

Panel Upgrades & Service: common questions

How do I know if my panel needs replacing?

Usually it is one of a few signs — breakers tripping under normal use, no room left for another circuit, rust or scorching inside the cabinet, or an obsolete type nobody makes breakers for anymore. We open it, look, and tell you whether it is a this-year job or a plan-for-it job. Sometimes the honest answer is that it can wait.

Will my power be off?

For most of the work, yes. Part of that depends on the utility disconnecting at the meter, so we tell you up front what to expect instead of promising an hour. Anything that has to stay running is worth mentioning when you call.

Do I need a permit just to swap a panel?

Yes, and it gets inspected. An unpermitted panel swap tends to surface at the worst moment — during a sale, or in an insurance claim after something else goes wrong. The permit is in our price rather than offered as an upgrade.

Where we work

Wiring homes throughout Washington County

Most of our work is in Washington County and the neighborhoods around it. Older housing stock is a large part of what we do, so if your house still has a fuse box or wiring nobody has looked at in forty years, that is a normal call and not an embarrassing one.